AMAK / NAJRAN
PROJECT
CHANGING BASKET SYSTEM (FOR 54 PERSONS)
LOCATION
SAUDI ARABIA
FIRM
AL MASANE AL KOBRA MINING CO.
DATE
2019
PROCESS
This is the changing basket system project of Al Masane Al Kobra Company implemented in the facility in Najran.
The project in general; It is a technical clothes hanger system that can be used instead of locked clothes storage cabinets in the industrial area. Most equipment in the changing basket system is stainless, hot dip galvanized / cold galvanized coating, electrostatic paint or chrome plated. The system includes spring, basket, steel rope, lock system, seat, chain, reel, code plate, warning label and C cornice.
In this way, the changing basket system; The bright and spacious dressing rooms, open motion area, provide a hygienic, safe and secure environment.